Close Menu
SagePay - Accepted cards Call us today Visit Samson Awnings Insulated Industrial roller shutter door Security Shutters Steel Side Hinged Garage Doors Insulated electric roller garage doors

Sectional Overhead Door Delivery Times

We offer a wide range of insulated sectional doors for both domestic and industrial applications and the delivery dates are very different between the 2 types.

Domestic Sectional Doors.
We offer both standard and purpose made insulated sectional garage doors and most of them can be offloaded by one or 2 people upon delivery with varying size delivery lorries for the task used.

Industrial Sectional Doors
All the industrial sectional doors are made to order and will be delivered on far larger lorries generally with manual handling far more difficult and we advise the use of lifting equipment on site. 


Delivery Times:

Industrial Sectional Doors

Hormann - All SPUF42 and SPU67 models available on a fast track programme
4 weeks delivery from order

All other sectional doors with full glazing, wicket doors and other non standard features - 10 - 12 weeks from order

 

Samson Sectional Doors - Insulated steel models
6 - 8 weeks from order

 


Domestic Sectional Garage Doors

Hormann Steel Sectional Garage Doors (Same for Garador)
10 - 12 weeks on standard sizes and colours but some sizes and colours are ex stock - please check before ordering with us.
+2 weeks for wicket door options included on order
10 - 12 weeks for non standard and European sizes
+2 weeks for LPU 67 super insulated models

 

Carteck Steel Sectional Garage Doors
Approx. 6 weeks on all standard and purpose made sizes in any of the colours.

 

SWS Seceuroglide Steel Sectional Garage Doors
Standard size doors 6-8 weeks from order

Non Standard sizes and colours - 5 - 6 weeks from order