Roller Shutter Door Delivery Times
Every single industrial and commercial roller shutter door we offer is made to measure to the exact millimetre. We have created specific models for purchasing where they are either single or three phase motors and also tube motor models and then also pre specified features which are very popular with customers too. However we can manufacture roller doors with massive variations in the specification to suit the site conditions or customer needs on access control.
Delivery times can be affected quite often by the final colour choice, specialist controls or whether the specific model is manufactured in the UK or Germany.
General Delivery Times are as follows:
SeceuroDoor
All models as presented in our shop - 3 - 4 weeks from order
Models with special colours or special specifications for controls - 4 - 6 weeks
SeceuroShield
All models - 2 - 3 weeks from order
Gliderol Series B
Manual or Electric 4+ weeks
Teckentrup
All models 10 - 12 weeks
Hormann
we regret that Hormann are currently unable to deliver to any DG postcode
All models 10 - 12 weeks
For domestic roller garage doors see ‘Garage and Entrance Doors’ delivery page for latest information here
Site Delivery
On larger roller shutter door sizes specialist transport is used and it is imperative we have full details of the site delivery and any potential restrictions for large lorries.
It will be the responsibility of the customer to provide suitable off loading facilities and take responsibility for the offloading process and handling from the vehicle.
We can pre arrange assistance and handling equipment if required at extra cost
The offloading of the large doors will nearly always require on site lifting equipment.